ONE CONFIRMED PROJECT PLAN
Turnkey Layer Farm Planning & Equipment Coordination
Coordinate the farm layout, poultry-house interfaces, cage systems,
automation equipment, delivery preparation and installation support around
one confirmed project plan.
Start With Your Project Information
View the Scope of Responsibility
Clear scope:
DAOFENG coordinates equipment-related planning and supply interfaces. Local approvals, building design and civil construction are completed by the customer’s appointed local professionals.
START WITH YOUR CURRENT CONDITIONS
Where Is Your Layer Farm
Project Starting From?
You do not need a complete engineering file before the first discussion. Start with the information you already have.
Land, No Poultry House Yet
Country and project location
Available land dimensions
Target bird capacity
Climate and altitude
Water and power conditions
Planned construction schedule
01
PLEASE PREPARE
02
Existing Poultry House
PLEASE PREPARE
Internal length, width and clear height
Columns, doors and windows
Current ventilation arrangement
Water and electrical interfaces
Photos, videos or available drawings
03
Expansion or Automation Upgrade
PLEASE PREPARE
Existing equipment and constraints
Current operating problems
Target capacity or automation level
Available shutdown period
Expansion and phasing plan
Share the Available Site Information →
Send the Available House Dimensions →
Share the Available Site Information →
ONE COORDINATED FARM SYSTEM
Coordinate Every
System Around One Confirmed Farm Plan
Farm layout, poultry houses, feed handling, egg
collection, manure transfer, utilities, staff access
and future expansion are reviewed as one
coordinated operating system.
CONCEPTUAL LAYOUT
Clean Route
Service Route
Reserved Expansion
Layer Houses 01
Layer Houses 02
Layer Houses 03
FEED STORAGE & SUPPLY AREA
EGG COLLECTION & STORAGE
FUTURE EXPANSION AREA
Reserved relationship only - final position subject to review
CLEAN ROUTE
SERVICE / DIRTY ROUTE
WATER & POWER INTERFACES
OFFICE & SERVICE AREA
BIOSECURITY ENTRANCE
Central collection connection
MANURE
TRANSFER &
DRYING AREA
MANURE
STORAGE
& WASTEWATER INTERFACE
equipment relationship
site interface
Discuss Your Project Conditions →
Conceptual layout illustration. Final planning depends on site conditions and confirmed project requirements.
Work Scope
DAOFENG Project Team
Manufacturing & Technical Team
Customer / Local Team
Farm planning
Poultry-house design
Farming equipment
Local civil works
Installation and commissioning
After-sales support
Confirm project requirements and coordinate overall farm planning.
DEFINED RESPONSIBILITY
Develop equipment layouts and provide technical requirements for farm planning.
Who Coordinates,
Who Supplies and Who Completes
the Local Work
Provide site data and confirm local planning requirements and approvals.
Responsibilities remain visible before equipment enters production.
Coordinate design inputs, drawing revisions and customer confirmation.
Provide equipment layout drawings and requirements for house dimensions, ventilation and utility connections.
Arrange local building and structural design, approvals and construction.
Confirm equipment configuration, supply scope and commercial terms.
Manufacture, inspect, pack and supply equipment according to the confirmed technical specifications.
Provide equipment loads, fixing details and requirements for openings and utility connections.
Provide installation guidance, commissioning support and operator training within the agreed scope.
Provide technical troubleshooting, maintenance guidance and spare-parts support under the agreed service terms.
Coordinate equipment requirements with the customer’s local team.
Coordinate technician deployment, site preparation and installation schedules.
Complete civil works and site utilities according to confirmed drawings and local requirements.
Confirm specifications and arrange payment and import procedures as agreed.
Arrange port access, customs clearance, transport, unloading, local installers and site resources as agreed.
Provide equipment details and fault records, and carry out routine operation and maintenance.
Receive service requests and coordinate follow-up.
Detailed responsibilities, service arrangements and costs are specified in the confirmed quotation, technical documents and contract.
FROM AVAILABLE INFORMATION TO CLEAR OUTPUTS
01
02
What You Provide and
What DAOFENG
Organizes
What DAOFENG Provides
The first review turns available project information into a clearer planning and quotation basis.
What You Provide
Power and Water Supply Conditions
Automation preference
Construction schedule
Budget range
Country and project location
Land or house dimensions
Target capacity
Climate and altitude
Preliminary arrangement
Cage-row and aisle proposal
Coordinated system configuration
Scope and exclusion list
Equipment quotation
Interface requirements
Packing and delivery preparation
Installation-support plan
COORDINATED EQUIPMENT SYSTEMS
Configure Each System Around the Same House and Operating
Plan
Final models are confirmed from capacity, house dimensions, climate, utilities, automation level and operating method.
01
04
05
03
06
Layer Cage System
Egg Collection
Manure Removal
Climate & Control
Drinking Water System
Input: rows, house exits and packing-room position.
Interface: belts, elevators and cross conveyors.
02
Feed Storage & Feeding
Input: daily demand, silo position and feed route.
Interface: delivery access, conveyors and house feeding.
Input: house dimensions, capacity, row and tier limits.
Interface: feeding, drinking, egg and manure systems.
Input: source, pressure, quality and flushing plan.
Interface: filtration, dosing, drainage and monitoring.
Input: climate, altitude, density and power stability.
Interface: fans, pads, inlets, sensors and controllers.
Input: handling frequency and final destination.
Interface: house belts, transfer and drying/storage.
PROJECT REFERENCES
Project References and Our Role
Explore selected layer farm projects and equipment applications to see how site conditions inform farm planning, equipment selection and installation. Each case page outlines the project location, capacity and the scope of DAOFENG’s involvement.
Project References and Our Role
Equipment Installation & Application
Farm Planning & Operating Logic
View Verified DAOFENG Projects →
START WITH WHAT YOU ALREADY KNOW
Tell Us What You Already Know About
the Project
Prefer a
Direct Conversation?
Use WhatsApp to share your country, planned capacity, project stage and any available drawings or photos.
Message on WhatsApp
Your information will be reviewed to clarify the next practical step.
Final solutions and commercial terms are confirmed only through project-specific written documents.
You do not need complete drawings before contacting us. Share the available information and we will help identify what should be confirmed next.